New membrane systems
Modules can be selected around required area, tank arrangement and operating philosophy.
YiFu Trading
Module assemblies that organize ceramic flat sheet elements for permeate collection, aeration, cleaning and system integration.
Product overview
A ceramic membrane module is more than a group of membrane plates. Frame spacing, permeate collection, aeration distribution, lifting access, piping and cleaning procedures all affect system operation.
YiFu coordinates module sourcing against the tank, hydraulic duty and required scope. Existing drawings are especially important for replacement projects.

Application fit
These are potential roles, not guaranteed performance claims. The complete process and verified product limits must be reviewed.
Modules can be selected around required area, tank arrangement and operating philosophy.
Dimensional compatibility, connections and operating conditions must be checked—not only nominal area.
Smaller configurations may support application verification before a full-scale decision.
Selection
Module dimensions and interfaces cannot be assumed across manufacturers. Approved drawings and written technical confirmation are required before order placement.
Technical parameters
| Parameter | Published value | Selection note |
|---|---|---|
| Reference model | YF-100-6 | YiFu model designation; technical values are based on manufacturing-partner reference data. |
| Element quantity | 15 plates per module | Confirm installed spare strategy and final configuration. |
| Total membrane area | 6 m² per module | Based on the supplied reference brochure. |
| Overall dimensions | 935 × 230 × 280 mm | Confirm tolerances, connection position and lifting clearances. |
| Dry module weight | 32 kg | Verify before support or lifting design. |
| Filtration mode | Negative-pressure suction | System operating sequence and controls remain project-specific. |
| Reference operating pressure | -0.1 to -0.3 bar | Confirm the selected model and instrument convention. |
| Air-scouring requirement | Project-specific | Confirm airflow, diffuser layout and operating cycle with the final system design. |
FAQ
Sometimes, but only after checking dimensions, connections, membrane area, aeration and operating conditions.
The available engineering scope must be confirmed for each inquiry. Provide the tank and process information so the relevant partner can define what can be supplied.
Available drawings and approval steps depend on the selected manufacturing partner and project stage.
Share water data, flow, treatment objective or an existing membrane model. YiFu will coordinate the next technical questions.