allen@yifutrading.com+86 13661587555Shanghai, China

Model selection

AKS603 sizing starts with the operating point

SEKO Tekna AKS603 may be considered when the calculated dosing flow and actual discharge pressure fit the manufacturer-approved performance curve. The published 4–8 l/h and up-to-12 bar envelope is a size range, not confirmation that every flow is available at every pressure.

It may be reviewed for lower-flow antiscalant, acid, alkali, oxidant or reducing-agent addition when the chemical program establishes the required dose and the injection pressure is verified.

YiFu Trading supplies dosing pumps as supporting equipment for membrane and water-treatment projects. YiFu does not claim to be an authorized SEKO distributor, and the exact revision, liquid end, connections, accessories and delivery scope must be confirmed before quotation.

SEKO Tekna AKS603 metering pump with installation accessories
AKS-series product reference. The same supplied image is used for the AKS603 and AKS800 pages; confirm the exact nameplate and configuration before order.

Published hydraulic envelope

AKS603 flow and pressure range

SEKO's Tekna series brochure is the source for the model-size range below. Final selection requires the current technical data sheet and the applicable performance curve.

ModelSEKO Tekna AKS603
Published flow range4–8 l/h
Published pressure rangeUp to 12 bar
Dosing modeConstant dosing with an analog interface for the AKS family
Configuration statusLiquid-end materials, seals, voltage, connections, stroke data and accessories require order-specific confirmation
Selection limit: Maximum flow and maximum pressure values must not be combined without checking the approved curve. Chemical compatibility and installation conditions can also change the suitable configuration.

Engineering checks

Information that determines AKS603 suitability

  • Chemical name, concentration and safety data
  • Calculated minimum, normal and maximum dosing flow
  • Static and dynamic pressure at the injection point
  • Required turndown and manual control expectations
  • Suction lift, tank level and priming conditions
  • Wetted-material, seal and connection compatibility

Membrane-system integration

Related treatment pages for the AKS603 duty

The pump is supporting equipment. The membrane process and chemical program define where and why dosing is required.

Water Reuse

Connect chemical conditioning to the required reuse quality and downstream equipment.

Review water reuse →

Request a configuration review

Send six duty details

Provide the destination country plus the chemical and concentration, required flow, required discharge pressure, dosing application and quantity. Include the control method and injection-point conditions in the application description.

For manufacturer information, consult the official SEKO Tekna AKS page and the current technical data sheet.

Request a AKS603 Review
WAWhatsApp Allen